Monday, May 07, 2007
Culture, cafes and work
Minutes later his Treo crashed and died and he was phoneless for 24 hours until we got back to cold New York. The Treo was pronounced DOA by t-mobile so they lent him a regular phone until they can ship a new one from head office. The man is completely lost without continuous email access!
Friday, April 27, 2007
One last chore before vacation time
Time is going to be short when we get back from vacation so we decided at 7 pm last night to take out the floating vanity. It should have been easy because the water lines weren't corroded, but the P-trap was shut fast and we didn't have a 2" wrench. A quick trip to Home Depot and $10 later we had the p-trap undone. Unfortunately, the faux marble countertop was so heavy, and we didn't want to damage the tiles taking it off, that we couldn't shift it in one piece. A couple of bangs with Big Bessie the sledgehammer and the top was in three smaller pieces and on its way to the garbage.
We knocked off only three tiny triangular pieces of tiles and they came off intact so we can thinset them back on when we get back from our holiday.
Then we realised that our decent flat-bladed screwdriver was missing and the other ones were to big or to small to unscrew the vanity from the wall. Hey, ho, back to Home Depot we go.
Thursday, April 26, 2007
Magnolias
Magnolias are at best a fleeting joy, but this year, with the frigid temperatures that never seemed to end, followed by an immediate rise into the eighties, they are already going over.
More photos of the trees in blossom on flickr.
Wednesday, April 25, 2007
Bathroom prog... -oh, who am I kidding?
It can't be said we are making progress, not even slow progress with the bathroom renovations. Although we are both using the boys' bath to shower in we can't hang a towel anywhere but the floor at the moment because the contractor is too busy to pop in and drill holes for the hardware. We did screw in the robe hook* in the girls' bath on Saturday so you have a choice of places to put your wet towel in that room but no-one wants to get it dirty before Verity has a chance to use it. And we're still waiting for the countertop for the vanity. The installers are going to pick up it up from the fabricators today but can't install it until we get back from vacation.
I'm freaking ever so slightly because I've heard that Silestone may have changed the composition of Ivory Coast making it more brown than green. I hope not because that was about the only thing Steven and I agreed on without discussion, disagreement or second guessing. And I ordered samples to be 100% positive of the color, so a change would be a major issue. We'll see on May 7th.
The glass mosaic tiles for the downstairs bath backsplash came in early (actually less than two weeks) and they look gorgeous against the beige hexagon ones so I'm hoping that they will go in without a problem. I'm also wondering whether I can tile over the exposed side of the terrazzo shower base to add an accent. The inside will be covered by a teak base insert from Teak Works 4u. I've placed the mesh against it and it looks doable and I'm pretty sure flexible thinset will stick glass tiles to anything. Can anyone think of a reason why not? You have until May 5th to come up with comments/suggestions/arguments.
*You may ask why we don't just screw in the hardware in the boys' bath ourselves and call it done. In the girls' bath we are screwing into sheertrock, if we make a boo-boo we patch and sand. In the boys' bath it's expensive porcelain tiles, if we screw up someone could get hurt, badly hurt.....
Monday, April 23, 2007
Earth Day II
Or the day we got lots of earth delivered. We are patching the lawn and extending the lawn strip between the rhododendron bed and the conifers to the left bordering the drive. Trimming the edges every time it was mowed had shrunk the lawn to 12" here and that's a tad narrow to mow. Now we're back to 4' so the grass should stand a chance.
All the leaves on the deciduous trees are opening now, I guess they needed the warm weather before they could unfurl, so the yard is looking better. Tomorrow the environmentally friendly hot oil guy will come and spray the trees and then we are going to plant the bed on the corner of the cul-de-sac with viburnums, day lilies and later some annuals. Got to have some more pretty in the garden.
Sunday, April 22, 2007
Earth Day 2007
Earth Day started badly as we drove to the drop off with Ruby Red and a load of old cell phones, telephones and other non-functioning e-paraphanalia, only to find that the Town of Huntington held it'd recycling day yesterday! A waste of time and gas driving there and we'll have to recycle this stuff another day in another way.
Worse, I found three perfectly drilled holes on the garage siding, which means the Carpenter Bees are back, so we'll have to get out there with something unecologically friendly before they make swiss cheese out of the redwood.
But on the upside we saw three red-tailed hawks circling the house this afternoon, we've turned the heating off but haven't yet turned the fans or the airco on, I gathered a bucketful of the most enormous pinecones from the huge fir tree and the cherry trees are about to blossom.
On balance, a beautiful Earth Day,
Friday, April 20, 2007
Celebrations
Lots of things to celebrate this week in addition to finishing the first bathroom remodel. I got my Social Security number at long last and that means I am a certified, numbered real person and with that and my Dept of Homeland Security photo id I was able to renew my NY state driving license, which expired in November. (Living in NY and being dependent on your husband's visa is both demeaning and frustrating; I've been a kept woman and felt like chattel. It does little for one's self-esteem, especially when they take away your driving privileges because your visa has less than six months to run, even though you've been granted an extension for three years). And the number of places I'm asked to show my driving license here? Banks, stores, airports..... it's impossible to exist without one. But enough of the Kafkaesque nightmare that is USCIS, Department of Homeland Security and NYS DMV. I am now legitimate again.
Sadie
The biggest celebration though is that after an entire month Sadie the dog has decided that the Fatboy dog bed isn't so scary and she's taken to sleeping on it at night (after Cassis the cat has made it cosy and warm. I'm still waiting for Polly to pluck up the courage to try her bed out.
Polly
Ooh, and one more huge celebration. I did not know this until two minutes ago but today is NATIONAL GARLIC DAY. I love garlic: roasted, fried, preserved in oil, in Rogan Josh, leg of lamb, sliced in poached sea bass, Skordalia it's all good. I think I will keep the celebration going all weekend long.
Thursday, April 19, 2007
Finally, one working bathroom
It's taken months - more than six, in fact since we began the renovation of the boy's bath; it's been even longer since we stopped using this bath because of the leaks through the ceiling below, and in fact, I've probably only showered in there twice in all the time we've lived here because the decor scared me so much. But today I took my first shower in there in at least a year and I have to tell you that it was the best shower I have ever taken.
The previous best shower was at the Manchester Airport Marriott in February, a Hansgrohe with enough water pressure to knock you off your feet (and a Toto toilet, Duravit sinks and faucets, if my memory serves me, very modern) but the Grohe Freelander is fantastic. I emerged not simply clean but revitalised, and that's without trying out the "massage" spray. I cannot wait to get back in there tomorrow morning.
One thing I know I'll do differently in the master remodel, though, is to spring for the thermostatic shower valve. Fiddling around with the temperature while huge jets of icy water shoot at you can be a little strenuous first thing in the morning. Tomorrow, I'll put the shower on, then clean my teeth while it warms up. I know, wasting the earth's resources, but what's a girl to do?
Wednesday, April 18, 2007
Shower Doors Installed
Twenty-three hours, thirty minutes and counting.
And just in case anyone has forgotten the horror that was there before:
Smaller, darker and scary...........
Saturday, April 14, 2007
Original Style
Saturday was action-packed. We have a lot to do to finish off the bathrooms before we head abroad for a week at the end of the month. I'd planned a day that started with giving an extra coat of paint to the boy's bath ceiling. That has to be done this weekend as the guys are ready to install the frameless shower doors and I don't want anyone wielding a roller in there once those babies go in. Then we have to take the hard top off my Jeep, go pick up the teak shower base and then put the soft top on before it starts raining. We needed to go pick the tiles for the backsplash in the downstairs bathroom and make sure they were in stock or available within four weeks so that bath gets finished before the visitors arrive in late May. Once they start arriving there'll be no more construction, or demolition for that matter, until September.
Then Steven came home last night and broke it to me at dinner (his motto is: always break the bad news to your wife in a public place, and preferably when she's had a drink, that way she won't shout) that he'd invited a colleague over to solve a work problem. That threw the scheduling out a little, especially when I invited colleague and husband to dinner afterwards. And the house was covered in dust and dog hair as usual.
Basically we just hit the ground running this morning. Steven walked the dogs while I showered. We were at the tile store at 9am. and out by 9:50, which was pretty good as they didn't have the tile I'd chosen (discontinued), the second choice was paper backed and I wanted mesh, and the third choice we decided just didn't look right. Finally we settled on this coppery metallic glass mosaic by Original Style. I had to buy a box, but because it was my lucky day I got a huge discount and it wound up being cheaper than the stuff on ebay. Only drawback is that it's shipped from the UK so it'll be "two weeks" before we get it.
After that a quick run to the supermarket and the fishmonger, a dash aound with Glassex and the Dyson and we took the top off the car without damaging ourselves. All done by 1:30. Then some devil made me check out the teak base and despite the large "FRAGILE" label someone had dropped it and scuffed one end pretty badly. So that had to go back, and it will be "two weeks" before the replacement arrives.
Never mind, I got the glue of the shower base with Goo Gone, picked up the dry cleaning, walked and fed the dogs and I still have time to blog before dinner.
The boys' bath ceiling though, that will have to wait until tomorrow.
Friday, April 13, 2007
Moo
Modernemama Moo card
Thirty-three months is an odd date to celebrate but that's how long we've been in this house and roughly how long I've been scribbling my name, address and phone number on scraps of paper. We didn't bother with change of address cards when we moved, we just emailed everyone the details but new acquaintances have been forced to try to decipher my increasingly incomprehensible handwriting.
I was on the point of going to the local Minute Man to order something generic when Flickr started offering Moo cards. These are the cutest little cards with coordinates and digits on the back and your selection of your favourite Flickr photos on the front. I had a lovely time choosing 30 photos to make into 100 calling cards and they were shipped to me (all the way from the UK by Royal Mail) yesterday. They are even more gorgeous than I imagined, great quality, tiny and totally personal.
Now I just have to find those "attractive strangers" Moo suggests I give my contact info to and hand them out.
Modernemama Moo card
Wednesday, April 11, 2007
It must be spring
Because finally the snow has gone and the ground is soft enough to plant our new mailbox.
The box and its post have been sitting in the garage since January when I was fooled by the unseasonably warm weather into ordering a new modern mailbox. Today it was deemed warm enough to tackle the project. I can say that it was barely warm enough, it's freezing still in New York but things are budding in the yard and at least now the mailbox is by the drive we won't have to wade through 6" floodwater to get the post every time it rains. And even if the front gets flooded, the Da Vinci houseArt mailbox has a handy access hatch at the back too.
Hurrah, another project off the list!
Sunday, April 08, 2007
Downstairs bath remodel v3
Marcellin Dufour '83
It was meant to be.
Saturday, April 07, 2007
In Memorium
We are in mourning today.
Last night the cathode ray tube in my ruby iMac G3 emitted a loud bang, the screen went dark and that was effectively that. The iMac was just about the first thing we bought when I arrived in the US at the end of September 2000 and it's been pretty much turned on ever since.
Although we added some extra memory in 2003 we never upgraded to OS X because I knew Ruby didn't have enough power to drive it. As programmers stopped writing for OS 9 Ruby's functionality has been declining. Some web pages looked truncated on her screen, but I didn't care, she opened my email and kept my photos and acted as the server for the wireless system in the house.
And know she's gone it renders my original iPod obsolete too, as it was only compatible with pre-OS X systems. Without Ruby there's going to be a big hole in the middle of my desk but the hole in my heart is bigger.
Ruby Red RIP 2000-2007.
Thursday, April 05, 2007
Downstairs bath remodel
I guess we'll be spending this weekend checking out the trim tiles in the flesh and making sure we can remove the existing vanity without doing any damage to the wall tiles.
Wednesday, April 04, 2007
Is there rehab for remodelers?
It's like a bad habit we can't break. Actually, if I'm honest I have the habit, Steven just supports it.
The boys' bath wasn't even half-way done before I started on the girls' bath. This was completely crazy because the master bath shower has been out of commission for months (possibly over a year, I can't bring myself to check). The logical thing to do, and let me say also the plan when we first making "to do" list, was to remodel the master, then move on to the boys' bath. It's funny how easy it was to talk ourselves out of this plan and into Plan B: boys' bath, then master. The reasoning was we knew exactly what we wanted in the boys' bath but couldn't agree on anything for the master. We also told ourselves the boys' bath would be practice for the master, we'd get all the mistakes out of the way in a bath that was less important.
Well, that was a specious argument. In reality we knew the challenges and problems would be totally different; I just wanted to get rid of those crazed tiles. Somehow, though as the ugly tiles came off I realised I could not live with the avocado in the girls' bath. Once again, logic dictates that you wait until the first bath is done before you rip up the second. But I have a habit, so it had to be done.
Now the boys' bath is beautiful but it isn't finished yet: no shower doors, no hardware and the girl's bath doesn't have a working basin - won't have for at least two weeks- so why would I undertake the downstairs bath remodel at this time?
Because I have a serious problem, that's why. I have a habit and it's controlling me.
Sunday, April 01, 2007
Bathroom Renovations Part Three
It seems that faucet that we didn't think was leaking too badly back on Thanksgiving weekend was, in fact, silently dripping hot water onto the vanity door. The plywood has swelled up beautifully to the point I could no longer miss it when I walked in the door. The fact that I was also standing in a pool of water was a bit of a hint.
I turned off the hot water under the sink but the damage has been done. Tony the custom vanity guy is coming to measure for the countertop on the girls' bath vanity next week so I guess I'll ask him to make another floating vanity for this bath while he's about it. After all we already have the ceramic vessel sink and pillar faucet we decided not to use upstairs so the cost won't be as great as it might be.
The dilemma is whether I can do a partial update in this room. I love the original floor and the wall tiles are sand coloured hexagons in great shape. I think if we get rid of the fawn beige toilet and replace it with a white one and pick the right countertop we could get away with it. It would have a more beachy feel, which, as this is the bath people use when they come in from the beach or the pool, would be appropriate.
We'll see.
Friday, March 30, 2007
Bathroom Fixtures
The Toto Nexus maple seat is so warm and it's a soft close model so no-one can slam the seat down. Hurrah.
The vessel sink doesn't splash because it's huge and because the faucet has a water restrainer in it. It delivers just enough water in a steady stream to wash hands or face or clean your teeth. And what about that Tenso faucet? Form and function in one.
The Grohe Freehander shower kicks ass. So much water, sparkly, clean water that you definitely need shower doors. The shower door guys measured today and promise that in another two to three weeks I can try it out. I can't wait.
Oh and the best. As the plumbers were leaving they called me and told me they had totally changed their minds about the shower. It isn't a fancy-pants piece of chichiness. It is a beautifully designed triumph of engineering and they'd be happy to put one in their own bathrooms! This is true plumber praise.
Plumbing the fixtures
The plumber is here now, and for once he was thrilled by the tiles and vanity and the vessel sink. He thought the guys who cut the countertops did a perfect job, the Ronbow vessel sink is the best quality he's installed. He only ruined it by saying "Where's the fancy shower head you want me to install?". Oh well, I really shouldn't be seeking plumber-validation anyway.