Wednesday, March 14, 2007
Bathroom Tile
I was going for a totally clean look with the glossy 12" tiles but I actually like this. The wall behind the vanity and toilet will be tiled with the mosaic and the other walls with the large field tile. It just adds another accent. I love it when we have a happy solution to a problem. I love it more when we can discuss it rationally and come to an agreement that suits us both.
I finally found out why the plumber installed a generic fill valve in the new Toto toilet rather than Toto's patented G-max system. He says the G-max is an inferior copy of this $10 Korky fill valve and he'll install the Toto one in the next toilet if I want because he'll be happy to get a call to repair it when it breaks down in two years' time.
If he'd told me that at the time, I could have decided whether to try it or trust him but he didn't, nor did he tell me he was ignoring my precise instruction to install the shower base as we'd discussed because he knew better. Working with the plumber is stressful because he doesn't communicate and he complains about everything from the choice of fixtures to the placement of the pipes. Mostly he complains that I'm European and haven't chosen Kohler or American Standard fixtures. Hmm, I'm not about to apologise for either the land of my birth or my taste. But at least he doesn't make fun of my accent like one guy we had (very temporarily) working for us.
Enough rant, I love my tiles, I can't wait for it to be finished so I can see the total effect.
Tuesday, March 13, 2007
Framed
Well, at least people will be able to orient themselves before they go off exploring the house.
This was Steven's birthday present. Happy Birthday honey.
Challenges
If you live in a twelve-sided house, one of your walls is going to be off, probably by a lot. That's a given, and today we found out which one. Of course it's the boys' bathroom wall, the one that you see as you come up the landing. And the bigger the tile the more obvious it will be. And that window in the middle is going to complicate things too. I'm beginning to understand why the original owners went for a busy broken pattern - it's much easy to hide the flaws that way.
The tiler is attempting to mitigate the problem right now, which involves a lot of "oh, c'mon" and "gee whizz", both of which he apologised for. If I were tiling that wall it would be more like "@#!&" and "%~/*". In fact just thinking about it makes my language more creative. And I'm resisting the temptation to run upstairs every five minutes to see how he's getting along, which is also very stressful. I've got a serious case of remodeler's remorse. Right now I can't remember why we started this remodel, the old tiles looked fine didn't they?
At least we've come up with a creative solution for the window frame, involving the accent tile. I think it's going to look ok, of course I hope it will look fabulous, but I'll settle for straight and tasteful.
Monday, March 12, 2007
The new window, same as the old window
The new window, like all the replacements in the house is by Marvin.
Wednesday, March 07, 2007
New profile photo
I haven't really calmed down enough about the Toto installation (or the shower base install* for that matter) to blog about it. At the moment I'm alternating between tears, swearing and sang froid, all the signs of grief, I have to note. I am too emotionally invested in this project.
But in the interest of looking at things in a more positive light I have changed the photo on my profile from the original photo I took of the back of the house on the day of the "walk through" April 2004, to one I took last year (2006) with the new paint and stain.
Just to remind myself that some contractors do a bang-on job, and that we have made at least one positive contribution to the renovation of our home.
*it looks like a Bugatti with a Trabi hubcap
Tuesday, March 06, 2007
Freakin' plumber
is making Jane freak out. This morning I went to take out the trash and I noticed that the Toto G-max fill valve was still in the Toto toilet box. Now that was surprising because the toilet had been flushed three times by the plumber before he left. I ran inside and opened up the tank and there was an ordinary Fieldmaster fill valve inside. Why? Why would anyone take a piece of equipment specifically designed to work with the toilet and replace it with some generic thing?
I rang Toto to see what would happen if we left the Fieldmaster in there and they said it would affect the fill rate and eventually the flow of the toilet. Great. I ordered the Toto is because the G-max has a great reputation and because all the plumbers like them. This plumber told me it was a "good" toilet. So once again why? I'll be asking him to explain and then install it as it was meant to be installed, but only when I've calmed down.
Monday, March 05, 2007
Welcome Toto Nexus
Okay, the Toto Neorest (tagline:Sophisticated Sensuality) is possibly more impressive but at a retail price between $3200 and $5600 depending on model I'm unlikely to do a proper comparison. Plus, the Neorest has a remote control. Who needs a remote control in the bathroom? The possibilities for losing that thing would be endless and probably quite expensive. And this bathroom is only 5'x8'. The Neorest lid opens as you approach it and flushes as you leave. In a space that small it would be constantly opening, flushing and closing. We'd probably wear it out in a six-month.
More gems from the plumber
One thing the plumber asks that is guaranteed to make modernemama freak out:
"Did you measure this?"
The answer was: I measured it; my husband measured it; two contractors measured it and YOUR DAD measured it.
"Well, I'd better check, it looks big.....hey, what d'you know, it just fits"
Good, now if I could just remember how to breathe again.
Things you are relieved to hear your plumber say:
1) "There's nothing difficult about this, it's just different"
2) "The base went in"
3) "Let's break for lunch"
Saturday, March 03, 2007
Do all plumbers moan?
1) I've never seen one of those before
2) I've never installed one of those before
3) I don't know how we are gonna install that
4) That's too heavy for the wall
5) That drain won't fit
I heard all of those on Friday afternoon. The offending items were: 1,4 the Grohe Freehander and 2,3,5 the mti-whirlpool shower base, both of which had been approved by the plumber's father (also our plumber).
They are coming back on Monday morning to install the toilet in the other bathroom and put in the shower base in this bath. I can't wait.
Friday, March 02, 2007
Bye Bye Green Vanity
Now we just have this little hole in the floor, and a scrap of that wallpaper insert on the vanity on the wall. It must have looked really, truly groovy in 1970.
Custom Copper Shower
The Expo catalogue arrived yesterday and fell open at the bathroom page, and there was something I'd never seen before, never even knew existed: a copper shower.
It spoke to me enough to make me tear up the plans for the master bath and install copper instead. Before I go down that route, though, several things occur to me: Wouldn't the copper get too warm for comfort if you're taking a long hot shower? How do you clean a copper shower? What stops it turning blue? How much would a 48"x36" beauty cost? What would Greg the Plumber say?
A bit of research later and I had the answers to some of my questions, the cost starts just shy of $3000. And there is a no-tarnish option. But...... will it fit in with my cool house? What other fixtures (towel rail, toilet holder etc) and tiles would look right with it?
So many questions. Here are a couple more: Has anyone seen a copper shower in real life? Better still , has anyone got one?
Wednesday, February 28, 2007
Snow Melt
I love the California overhang. You may get a little wet walking beneath but there is no maintenance and that is so much better than gutters.
Tuesday, February 27, 2007
Setting a New Budget
It's going to be the end of the week before the plumber can do the rough work and move the shower drain so in the meantime I thought I'd frighten myself by ignoring the bath remodels and looking at the budget for the 2008 kitchen remodel.
I started this spreadsheet back in July 2004 when we purchased the Sub-Zero with a view to building the kitchen around it and completing it within two years.
It seems we were a little optimistic in our timeline.
Over the past two and a half years I have researched options for replacement cabinets and countertops, chosen 16x16" and then 20x20"floor tiles, and picked out stainless steel appliances. The spreadsheet is a thing of beauty with internet links, retail and discount prices, lead times and possible alternatives. As we changed our minds about products, new versions came on the market, or prices rose, I updated the spreadsheet but the basic price of the remodel never fluctuated by more than a few hundred dollars.
Walking around Soho one Saturday last October we wandered into Henrybuilt and fell in love with the hardwood cabinets, they seemed to have been designed with our house in mind. Suddenly the perfectly acceptable Ikea boxes didn't seem to cut it anymore, even if we used our own custom doors. The budget got a huge makeover, upwards.
Then I starting reading the Brooklyn townhouse renovation blog Here is the House. Big mistake. And I showed the post on appliances to Steven. Even bigger mistake. He fell completely in love with the Hansacanyon LED faucet and wouldn't be dissuaded even when I showed him the price.
Of course you just cannot have a beautiful, expensive faucet pouring red or blue water into a bog standard kitchen sink, even if it is the BlancoPrecision 10: Super Single Bowl Undermount, sink of choice for Varenna and other German and Italian kitchen cabinet manufacturers. Never fear, Here is the House gave us an idea for a solution. We only have to add an extra $3000 to the budget and we can be professionally washing up, chopping vegetables and cooking with the Kohler PRO CookCenter sink. Actually, this will also solve a design dilemma too. We hate seams on countertops but the quartz we have chosen only comes in 10' slabs. Our sink area is 10' 8". If we go with the mega sink it is countertop width so we can have two separate pieces of quartz on either side. Smart but not priceless.
The new kitchen budget? Even though we will save on extra plumbing by not having a prep sink on the island and we save the cost of an extra sink and faucet, it's increased by 50% since we started and that's without adding the built in coffee maker I have lusted over. I wonder what we can cut back on so we can afford this remodel before we get too old to enjoy it. Food maybe?
Monday, February 26, 2007
Setting a new timetable
It seems my suspicions were correct and Steven didn't make time to arrange delivery of the shower base while I was away because one call to the bathroom accessory store this morning and 10 minutes later I had the MTI shower base in my garage. I wonder how long it will be before it finally gets to the bathroom?
Yesterday we agreed to revise the order of work for the on-going remodel. It now reads:
1) the boys' and girls' baths will be done simultaneously - whatever part of the project is less hassle (requiring the fewest runs to the hardware store) will get done first
2) the downstairs bath will get its facelift: new vanity, sink and faucet, plus new towel bar and toilet roll holder.
3) the master bath
4) the laundry room
Depending on how long the first three take we may do the laundry room with the kitchen remodel - that's the big project for 2008.
It's funny how things can quickly change, though. This morning we woke up to 3" snow so I reached for a dog towel in the laundry and tore the sliding door off the last remaining cabinet.
The revised, revised list goes:
1) boys' and girls' bath; depending on number of tiles we use there we may have enough to tile
2) the laundry room floor, making this project #2.
3) downstairs bath facelift
4) master bath
Either way it is going to take much longer than we thought to finish this part of the remodel and I seriously think we need to increase the gin budget.
Saturday, February 24, 2007
Renovation frustration
Okay, I didn't really expect to have all the bathroom renovations completed in the week I was away (although I did leave Steven detailed instructions) but it was really depressing to come home and find nothing had been done. Everything was exactly as I left it, except that an extra layer of dust, dirt and dog hair had accumulated.
Even the shower base that they promised to deliver on Wednesday or Thursday hadn't arrived. My feeling here is that Steven was too busy to schedule a drop off time, but I could be doing him a disservice. At this rate the boys' bathroom won't be ready for him to shower in on his birthday, we'll be lucky if it's done by Memorial Day.
Friday, February 16, 2007
So simple even a .......
The Martin Agency did such a great job for Geico with its Caveman commercials that the Caveman now has a life in cyberspace. I wandered happily through his apartment, envying the flat screen tv and his awesome kitchen and clicking on every possible clickable link (tip: click multiple times, this is a very innovative site) but it wasn't until I got to the bathroom that it hit me. The faucet, vessel sink and wooden vanity look pretty similar to what I've chosen for the girls' bath.
I have caveman taste.
Thursday, February 15, 2007
Basic Needs v Bathroom Jewelry
I was extremely distressed at having to part with $500 yesterday just to ensure continuing warmth and security. The garage door opener was declared dead and that was the cost of a new one, installed.
Apparently it was a miracle that the thing had held up for 38 years because the door is heavy and the Genie opener only had a single chain. Amazing. So I should expect the other one to go any second now? Anyway, I am now the proud owner of a double chain opener, guaranteed for one year.
I had that $500 marked down for the start of the downstairs bath remodel and specifically for either one of these beauties. They are both sleek and modern but the one on the left is the angular Tosca Bergamo and on the right we have the more traditional KWC Vesuno Classic.
Strictly speaking, I don't need a new faucet, but we do have a leak on the existing one, and the vanity is starting to de-laminate and I hoped that while we were on a bathroom remodelling kick we should just go with it and update the lot. I hadn't discussed this with Steven because I know he'd be even less enthusiastic than he was when I suggested adopting a new kitty........
In the unlikely event I should have a spare few hundred bucks in the future it would be good to have the fixtures already chosen, so some input on my faucet choice would be appreciated. Vote here for your favourite
Wednesday, February 14, 2007
Tiles & Vanity
Oh, and hardware too. The tiles were delivered in the ice storm and join the vanity in the garage. If you're counting that's two bedrooms and a garage full of stuff waiting to be transformed into the kids' bathrooms.
I scored a major deal at Expo yesterday paying $1.68 per cabinet knob, reduced from $7.99 (their price, list price elsewhere about $6.00!) As the cheapest I could manage on The Hardware Hut was $5.70, I was a happy girl. And the custom vanity countertop is being made as I type. I should have the whole thing in ten days. I'm still waiting for word on the window and the shower base, though and that's what we need to re-start the boy's bath.
Garage Door
If you were a garage door which day would you pick to stop working?
a) A warm and sunny summer's day
b) The first ice storm in several years
This house has a sense of humour.
Sunday, February 11, 2007
Weekend Chores
On Saturday Steven put a coat of primer on the new ceiling in the boy's bath and re-attached the towel rails in the girl's bath. We chose hardware for the new vanity but they are out of stock so eventually we may have to find something else. I'm hoping not as they are the right size, shape and price and we both like them. How often does that happen?
No luck getting the new vanity installed though. The faucet lines are as tightly corroded as the one's in the boys' bath were, and the P-trap won't move either. Oh well, the plumber will be here next week to install the shower base and he can wrench it apart then. Things are progressing but really, really slowly.