Saturday was action-packed. We have a lot to do to finish off the bathrooms before we head abroad for a week at the end of the month. I'd planned a day that started with giving an extra coat of paint to the boy's bath ceiling. That has to be done this weekend as the guys are ready to install the frameless shower doors and I don't want anyone wielding a roller in there once those babies go in. Then we have to take the hard top off my Jeep, go pick up the teak shower base and then put the soft top on before it starts raining. We needed to go pick the tiles for the backsplash in the downstairs bathroom and make sure they were in stock or available within four weeks so that bath gets finished before the visitors arrive in late May. Once they start arriving there'll be no more construction, or demolition for that matter, until September.
Then Steven came home last night and broke it to me at dinner (his motto is: always break the bad news to your wife in a public place, and preferably when she's had a drink, that way she won't shout) that he'd invited a colleague over to solve a work problem. That threw the scheduling out a little, especially when I invited colleague and husband to dinner afterwards. And the house was covered in dust and dog hair as usual.
Basically we just hit the ground running this morning. Steven walked the dogs while I showered. We were at the tile store at 9am. and out by 9:50, which was pretty good as they didn't have the tile I'd chosen (discontinued), the second choice was paper backed and I wanted mesh, and the third choice we decided just didn't look right. Finally we settled on this coppery metallic glass mosaic by Original Style. I had to buy a box, but because it was my lucky day I got a huge discount and it wound up being cheaper than the stuff on ebay. Only drawback is that it's shipped from the UK so it'll be "two weeks" before we get it.
After that a quick run to the supermarket and the fishmonger, a dash aound with Glassex and the Dyson and we took the top off the car without damaging ourselves. All done by 1:30. Then some devil made me check out the teak base and despite the large "FRAGILE" label someone had dropped it and scuffed one end pretty badly. So that had to go back, and it will be "two weeks" before the replacement arrives.
Never mind, I got the glue of the shower base with Goo Gone, picked up the dry cleaning, walked and fed the dogs and I still have time to blog before dinner.
The boys' bath ceiling though, that will have to wait until tomorrow.
Saturday, April 14, 2007
Original Style
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment